Building permit
Building permit for grandstands – official approval procedures with Bender as partner
When is a building permit required for grandstands?
Whether a building permit is required depends on the size, the federal state, and the duration of the setup. Temporary structures up to a certain size are approved through the inspection log procedure. Larger structures require a site-specific building permit from the responsible building authority. Clarifying the permit requirements early on is crucial for successful event planning.
Bender provides support throughout the entire approval process.
Bender Tribünen actively supports event organizers throughout the permitting process. The team provides all necessary technical documentation: structural stability certificate, setup plan, test log excerpts, safety concept, and capacity plan. This comprehensive documentation ensures the most efficient permitting process possible. Bender is familiar with the requirements throughout Germany and beyond.
Documents for the building permit
Typical approval documents: site plan, installation plan, structural stability analysis, proof of fire department access routes, evacuation plan, and safety concept. Bender provides all documents in an approvable format.
Allow time for approvals.
Building permits can take several weeks to obtain. Bender recommends initiating the process several months before the event and coordinates the submission of the documents.